Steam boiler house for “Rakhat-Shymkent”
  • images/objects/2019/11/1-1.jpg
  • images/objects/2019/11/2-1.JPG
  • images/objects/2019/11/3-1.JPG
  • images/objects/2019/11/4-1.JPG
  • images/objects/2019/11/6-1.JPG
  • images/objects/2019/11/8-1.JPG
  • images/objects/2019/11/9-1.JPG
  • images/objects/2019/11/10-1.JPG
  • images/objects/2019/11/11-1.JPG
  • images/objects/2019/11/12-1.jpg
  • Steam boiler house for “Rakhat-Shymkent”

Steam boiler house is based on the three boilers “VIESSMANN” made in Germany with capacity 7400 kg of steam per hour. Boilers used with natural gas and diesel burners “WHEISHAUPT”, Germany.

German stainless steel smoke stacks “JERMAIS” are 600 in diameter and 10 meter high.

The main parameters of the boiler house:

Total steam capacitykw22200
Main fuel natural gas  
Backup fuel diesel  
The temperature of saturated steam ° С 215
Process pressure bar 10
Automation total  

Used equipment in the boiler house

BoilersTHREE STEAM BOILERS WITH VITOMAX ECONOMIZERS 100 HS «VIESSMANN» GERMANY, Q=7 400 KG OF STEAM/ H
Burner «Wheishaupt», Germany
Pump equipment «Grundfoss», Germany
Chemical water treatment “BWT”, Germany