Skip to main content

«Sary-Arka», water treatment facilities

Karaganda region

images/objects/2020/14/5-1.JPG
images/objects/2020/14/1.jpg
images/objects/2020/14/2-1.JPG
images/objects/2020/14/4.jpg
«Sary-Arka», water treatment facilities
  • images/objects/2020/14/5-1.JPG
  • images/objects/2020/14/1.jpg
  • images/objects/2020/14/2-1.JPG
  • images/objects/2020/14/4.jpg
  • «Sary-Arka», water treatment facilities

Karaganda region, Bukhar-Zhyrau district, Doskey village, Sary-Arka FEZ territory, Water treatment facilities"

Block-modular hot water boiler house "VICTORIA" type 1 BMK2-250D based on two boilers "Buderus" (BOSCH), Germany with a capacity of 250 kW each. Diesel fuel burners "Riello", Italy, were used with boilers.

The chimney produced by KSM LLP, Ø325 H=18m the top layer is polished aluminum. The supporting structure of the chimney is manufactured by KSM LLP H=12m. Underground fuel tanks V=1x10m3 complete with fuel pumps "HPtechnik" Germany.

The main parameters of the boiler house:

Total heat capacitykw500
Main fuel diesel  
Temperature control ° С 90/70
Size m 6x3x3
The number of modules unit 1
Automation total  

Used equipment in the boiler house

BoilersTWO WATER -HEATING BOILERS LOGANO SK645 «BUDERUS», MADE IN GERMANY, Q= 250 KW
Burner «Riello», ltaly
Pump equipment «Wilo». Germany
Chemical water treatment «ATLAS-Filtri», ltaly
© 2011-2024 LLP «KSM» All rights reserved. Privacy policy.