Block Modular water boiler room "VICTORIA" type BMK2-1350G based on two boilers "Viessmann", Germany capacity of 1350 kW each. Burner devices are used with boilers. on natural gas "Elco", Germany.

Smoke pipes from Jeremias stainless steel, Germany Ø350 H = 8m.

The main parameters of the boiler house:

Total heat capacitykw2700
Main fuel natural gas  
Temperature control ° С 90/70
Size m 9x6x3
The number of modules unit 3
Automation total  

Used equipment in the boiler house

BoilersTWO WATER -HEATING BOILERS VITOPLEX 100 PV1 “VIESSMANN” (BOSCH), MADE IN GERMANY, Q=1350 KW
Burner «Elco», Germany
Pump equipment «Wilo», Germany
Chemical water treatment «ATLAS-Filtri», ltaly