Skip to main content

Construction of the building of the Department of Internal Affairs

Burabay district

images/objects/2019/09/2-1.JPG
images/objects/2019/09/3-1.jpg
images/objects/2019/09/4-1.JPG
images/objects/2019/09/1-1.JPG
images/objects/2019/09/5-1.JPG
images/objects/2019/09/7-1.jpg
images/objects/2019/09/8-1.jpg
Construction of the building of the Department of Internal Affairs
  • images/objects/2019/09/2-1.JPG
  • images/objects/2019/09/3-1.jpg
  • images/objects/2019/09/4-1.JPG
  • images/objects/2019/09/1-1.JPG
  • images/objects/2019/09/5-1.JPG
  • images/objects/2019/09/7-1.jpg
  • images/objects/2019/09/8-1.jpg
  • Construction of the building of the Department of Internal Affairs

The boiler room on the basis of two boilers "Viessmann", Germany with a capacity of 1300 kW each. Burner devices, combined gas / diesel “Elco”, Heramnia are used with boilers.

Smoke pipes from stainless steel of production "Jeremias", Germany Ø350 H = 24,2m. The supporting structure of the chimney production LLP "KSM" H = 22m. Underground fuel tanks V = 3x10m3 complete with HPtechnik fuel pumps Germany.

The main parameters of the boiler house:

Total steam capacitykw2600
Main fuel diesel  
Backup fuel natural gas  
The temperature of saturated steam ° С 95/70
Automation total  

Used equipment in the boiler house:

BoilersTHREE STEAM BOILERS WITH VITOPLEX 200 «VIESSMANN» GERMANY, Q=1300 Kw
Burner «Elco», Germany
Pump equipment «Wilo», Germany
Chemical water treatment “ATLAS-Filtri”, Italy
© 2011-2024 LLP «KSM» All rights reserved. Privacy policy.